Existing nuclear fleet: Ensure the safety of existing nuclear power plants

Direction of change: unchanged, compared with current law.

The lever. Future of reactors in service: extension of their lifetime, closures, or gradual phase-out of nuclear power. Direction rule: ↑ longer lifetime, reopenings; ↓: closures, phase-out.

« Conforter le rôle du nucléaire, énergie pilotable et décarbonée, en assurant la sûreté des centrales existantes et la construction à temps de nouvelles unités. »1

Translation by the editorsStrengthen the role of nuclear power, a dispatchable and decarbonised energy, by ensuring the safety of existing plants and the construction of new units on time.

Place publique, « Acte un – Notre vision pour la France » (codirecteurs de la publication : Aurore Lalucq et Raphaël Glucksmann), 23 June 2025. Position taken from a document of the candidate’s party or movement, not from a presidential programme.

No programme released. Positions taken from public statements, words of associates or documents of the candidate’s party, each dated and sourced; last recorded on 21 October 2026.

Encoding

No cost-schedule parameter for this position: see the costing for the reason.

Costing

Announced by the candidate

not announced

The cited source does not cost this measure.

Published costings

none

No external costing of this position recorded to date.

Our calculation

lever that cannot be costed

Lever with no coefficient in the cost schedule: the position is compared, not costed.

Current law, sources and limits of the cost schedule

Current law. Multiannual energy programme (PPE3, decree of February 2026): continued operation of existing reactors up to sixty years, or even beyond, under the supervision of the Autorité de sûreté nucléaire et de radioprotection (nuclear safety and radiation protection authority); no reactor closure scheduled.

Horizon. Not applicable for now.

Limits. Not costed at this stage. A nuclear phase-out or an extension beyond sixty years mainly involves investment costs (grand carénage refurbishment programme, decommissioning, replacement capacity) and effects on the electricity price, borne largely by EDF and not by the State budget; no comparable public costing is cited.

How to read these amounts. These are static costs and revenues, with no feedback effect, over a full year: nothing on growth, employment or the revenue that economic activity would gain or lose. A higher net cost does not on its own make a worse policy, nor net savings a better one: each programme rests on an economic model (demand-led stimulus, lower compulsory levies, consolidation of the public accounts…) that the cost schedule does not settle. GDP itself measures a volume of activity, not well-being or the usefulness of what is produced. Economic models and feedback effects.

  1. Place publique, « Acte un – Notre vision pour la France » (codirecteurs de la publication : Aurore Lalucq et Raphaël Glucksmann), 23 June 2025, p. 17. Position taken from a document of the candidate’s party or movement, not from a presidential programme. Read the source (Place publique, « Acte un – Notre vision pour la France » (codirecteurs de la publication : Aurore Lalucq et Raphaël Glucksmann)).