Energy, Raphaël Glucksmann
New nuclear reactors: Build new units on time, no number
Direction of change: change of another kind, or uncertain direction, compared with current law.
The lever. Number of new nuclear reactors the programme plans to order or build. Direction rule: ↑ more reactors.
« Conforter le rôle du nucléaire, énergie pilotable et décarbonée, en assurant la sûreté des centrales existantes et la construction à temps de nouvelles unités. »1Translation by the editorsStrengthen the role of nuclear power, a dispatchable and decarbonised energy, by ensuring the safety of existing plants and the construction of new units on time.
Place publique, « Acte un – Notre vision pour la France » (codirecteurs de la publication : Aurore Lalucq et Raphaël Glucksmann), 23 June 2025. Position taken from a document of the candidate’s party or movement, not from a presidential programme.
No programme released. Positions taken from public statements, words of associates or documents of the candidate’s party, each dated and sourced; last recorded on 21 October 2026.
Encoding
No cost-schedule parameter for this position: see the costing for the reason.
Costing
Announced by the candidate
not announced
The cited source does not cost this measure.
Published costings
none
No external costing of this position recorded to date.
Our calculation
not costed
New units with no number: nothing to cost.
Current law, sources and limits of the cost schedule
Current law. The PPE3 (decree published in the JO on 13 February 2026, period 2026-2035) provides for 6 EPR2 reactors (Penly, Gravelines, Bugey), with a first commissioning targeted in 2038 and 8 additional reactors as an option. It removes early reactor closures. EDF's estimate of 18 December 2025 is €72.8bn (2020 euros, excluding financing costs). The financing planned by the Nuclear Policy Council in March 2025 rests on a subsidised State loan covering at least half of construction and a 40-year CfD capped at €100/MWh in 2024 euros; the Council of 12 March 2026 set this loan at 60% of the total programme amount, funded by the Caisse des dépôts savings fund, and EDF committed to keeping to €72.8bn (2020 euros). It still has to be approved by the European Commission. The final investment decision is expected at the end of 2026.
Horizon. In €bn per year of State financing requirement (debt), during construction (about 2027-2038). The Maastricht deficit is affected only by the loan subsidy, which is not costed by the sources read.
Limits. This cost is not of the same nature as the others: a loan is a financial transaction that increases debt but not the deficit, except for the subsidised portion and any call on the CfD. Calculation: lower bound 72.8/6 ≈ €12.1bn per reactor (EDF, 2020 euros) × 60% / 12 years ≈ 0.61; central 79.9/6 ≈ €13.3bn (Cour des comptes, 2023 euros, EDF costing of late 2023, since superseded by that of December 2025) × 60% / 11 years ≈ 0.73; upper €13.3bn entirely lent over 11 years. Share lent: 60% (Conseil de politique nucléaire of 12 March 2026). The durations of 11 to 12 years are the editors' assumptions (from the decision at the end of 2026 to commissioning in 2038); yet EDF is aiming for 2038 for the first reactor and an interval of 12 to 18 months between the following ones: for the last reactors, disbursement in 2032 is probably lower, and the coefficient overestimates it. The loan will be funded by the savings fund of the Caisse des dépôts: its effect on State debt remains to be established. The Cour des comptes (January 2025) noted the absence of a « devis abouti » [“finalised estimate”]. Greenpeace estimates the relaunch at between €380bn and €650bn (campaigning figure, different scope). The CfD may cost or bring in money depending on market prices after 2038, hence beyond the 2032 horizon. Sign convention for options: negative = gain. Abandonment is given by the linear parameter. The 8 optional reactors are no longer an option: their disbursement schedule (2045 horizon) is not sourced, and the coefficient, calculated over 2027-2038, would overestimate them in 2032.
- EDF, communiqué du 18 décembre 2025, « EDF shares its forecasted cost estimate of the EPR2 programme for €72.8bn » (copie d'archive du 13 octobre 2026, le site renvoyant une erreur 403), 2025-12-18: « This forecasted cost estimate stands at €72.8bn2020 […] The target date for commissioning the first reactor at Penly is 2038, with the subsequent reactors scheduled to be commissioned at intervals of 12 to 18 months. […] A subsidised loan to finance at least 50% of construction costs; - A 40-year contract for difference; »
- Élysée, cinquième Conseil de politique nucléaire, 12 mars 2026, 2026-03-12: « EDF s’est engagé à tenir la cible de coûts de construction à hauteur de 72,8 Md€2020 et de calendrier du programme. […] Le prêt bonifié de l’Etat accordé au programme EPR 2 pour 60% du montant total du programme sera financé par le fonds d’épargne de la Caisse des dépôts. »
- Cour des comptes, « La filière EPR : une dynamique nouvelle, des risques persistants », janvier 2025 (page 32 du PDF), 2025-01-14: « Le coût de construction overnight de trois paires d’EPR2 est passé de 51,7 Md€2020 à 67,4 Md€2020 (soit 79,9 Md€2023), soit une augmentation de 30% à conditions économiques inchangées et hors effet de l’inflation. »
- PPE 3 : le décret sur la feuille de route énergétique publié au JO (AFP / Connaissance des énergies, via résultat de recherche), 2026-02-13: « Construction de six EPR2, première mise en service visée en 2038, huit réacteurs supplémentaires en option ; production nucléaire de 380 à 420 TWh en 2030. »
How to read these amounts. These are static costs and revenues, with no feedback effect, over a full year: nothing on growth, employment or the revenue that economic activity would gain or lose. A higher net cost does not on its own make a worse policy, nor net savings a better one: each programme rests on an economic model (demand-led stimulus, lower compulsory levies, consolidation of the public accounts…) that the cost schedule does not settle. GDP itself measures a volume of activity, not well-being or the usefulness of what is produced. Economic models and feedback effects.
- Place publique, « Acte un – Notre vision pour la France » (codirecteurs de la publication : Aurore Lalucq et Raphaël Glucksmann), 23 June 2025, p. 17. Position taken from a document of the candidate’s party or movement, not from a presidential programme. Read the source (Place publique, « Acte un – Notre vision pour la France » (codirecteurs de la publication : Aurore Lalucq et Raphaël Glucksmann)).