Climate, Bruno Retailleau
Energy renovations per year: MaPrimeRénov' abolished (€2bn), a « relais » [“successor”] announced without detail
Direction of change: abolition of a scheme, compared with current law.
The lever. Number of homes renovated each year to reduce their energy consumption, according to the programme's target. Direction rule: ↑ more subsidised renovations.
« supprimer les dispositifs sans résultat démontré (14 Md€). […] Transition : MaPrimeRénov’ […] 2,0 PLF 2027 ; Cour des comptes 2021 »1Translation by the editorsabolish schemes without proven results (€14bn). […] Transition: MaPrimeRénov’ […] 2.0 PLF 2027; Cour des comptes 2021
Encoding
| Parameter | Current law | Programme | Effective date or horizon |
|---|---|---|---|
| Major renovations assisted per year | 91,374 homes | 0 homes* (outside the range measured by the source: linear extrapolation) (assumption by the editors, see the costing) | Direct public aid in a full year |
Costing
Announced by the candidate
+€2bn
per year, saving. €2.0bn of savings in 2032 on the « Transition : MaPrimeRénov’ » line (press fact sheet no. 4); in the opposite direction, « Relais de MaPrimeRénov’ et TVA sur les certificats » [“Successor to MaPrimeRénov’ and VAT on certificates”], €3.0bn given back to households (fact sheet no. 14), with no split between the two.
Published costings
none
No external costing of this position recorded to date.
Our calculation
+€1.1bn* (outside the range measured by the source: linear extrapolation)
per year for the public accounts, saving, range +€1.1bn to +€3.3bn.
* Outside the range measured by the source: linear extrapolation (measured range: 91,374 homes only).
The calculation
- Major renovations assisted per year: (0 − 91,374) ÷ 100,000 = -0.91 times “+100,000 major renovations assisted per year”, each a cost of €2.6bn (1.2 to 3.6). Proposed value outside the range measured by the source: linear extrapolation (measured range: 91,374 homes only). A single year measured by Anah (2024: 91,374 major renovations, average aid per dwelling); any other value is a linear extrapolation, flagged as such. Central value brought down to the smallest amount (€1.2bn per step).
Assumption by the editors. Partial costing. Reading adopted: MaPrimeRénov', listed among the abolished « dispositifs sans résultat démontré » [“schemes with no demonstrated result”] (press fact sheet no. 4, €2bn of savings in 2032), is costed as the end of grants for major renovations; per-measure grants are not costed. Fact sheet no. 14 gives back to households a « Relais de MaPrimeRénov’ » [“successor to MaPrimeRénov’”], counted together with VAT on energy saving certificates (€3bn together), with no form or amount of its own: it is not deducted, and the gain is overestimated accordingly.
Coefficient calculated by the editors from Chiffres clés de l'Anah 2024 (DREAL Corse): the position is marked as an assumption by the editors.
Central value brought down to the smallest amount: gain acknowledged as overestimated, as the successor to MaPrimeRénov' announced by the candidate is not deducted; lower bound: average grant for a major renovation in a co-owned building (€11,818).
Figure announced by the candidate: no gap calculated: the announcement covers a different scope or a different year.
Current law, sources and limits of the cost schedule
Current law. The main instrument is MaPrimeRénov' (Anah). It comprises an assisted pathway for major renovations, per-measure aid and aid for co-owned buildings. It is supplemented by energy savings certificates (CEE). In 2024: 91,374 major renovations (€2,386m in aid) and 340,801 dwellings assisted in total (€3.29bn). The scheme was suspended from June to September 2025, then reopened on 23 February 2026 after the LFI 2026. The final amount of 2026 appropriations differs between sources (€3.5bn or €4.3bn in Anah commitments) and has not been checked in the act.
Horizon. Direct public aid in a full year. Anah 2024 scale in current euros. Includes neither the CEE (energy saving certificates), funded by energy suppliers, nor the cost of support services.
Limits. Central value: average aid across all major renovations (€2,386m / 91,374 ≈ €26,100). Lower bound: average aid in jointly owned buildings (€11,818). Upper bound: individual supported pathway (€36,271). In 2024, 59% of households aided for a major renovation were very low-income: a higher target would reach better-off households, with lower unit aid but an uncertain take-up rate. Fraud justified the 2025 suspension. A target announced in “renovated” homes is converted into major renovations before applying this cost schedule. Only the 2024 financial year is published by Anah in the sources read (key figures); 2025 volumes are known only from the press: the parameter's domain is limited to 2024.
- Chiffres clés de l'Anah 2024 (DREAL Corse), 2025: « « En 2024, 340 801 logement rénovés 3,29 Mds€ d'aides. » ; parcours accompagné « Aide moyenne par logement (en €) … 36 271 » ; copropriété « 11 818 » ; « TOTAL RÉNOVATION D'AMPLEUR … 91 374 … 2 386 » (M€) ; par geste « 3 622 » »
- MaPrimeRénov' 2026 : réouverture du guichet (monimmeuble.com, via résultat de recherche), 2026-02: « Le guichet a rouvert le 23 février 2026 après l'adoption du budget ; rendez-vous obligatoire avec un conseiller France Rénov' pour les rénovations d'ampleur. »
How to read these amounts. These are static costs and revenues, with no feedback effect, over a full year: nothing on growth, employment or the revenue that economic activity would gain or lose. A higher net cost does not on its own make a worse policy, nor net savings a better one: each programme rests on an economic model (demand-led stimulus, lower compulsory levies, consolidation of the public accounts…) that the cost schedule does not settle. GDP itself measures a volume of activity, not well-being or the usefulness of what is produced. Economic models and feedback effects.
- avecretailleau.fr, fiches presse « Rétablir l'ordre dans les comptes publics » (12 octobre 2026), fiche n° 4, p. 6. Open the document at this page.
Contest this encoding (prefilled email; procedure and deadlines)