costing
Édouard Philippe’s positions: what we were able to cost
10 costed positions out of 41 recorded (24%), plus 1 status quo at zero cost. The amounts below apply only to them: they say nothing about the positions that the cost schedule cannot cost.
No programme released. Positions taken from public statements, words of associates or documents of the candidate’s party, each dated and sourced; last recorded on 18 October 2026.
What these figures are worth Édouard Philippe’s profileEconomic model claimed
Bring the deficit down from over 5% to 2% of GDP by the end of the five-year term (golden rule), by cutting spending (half of the effort on social spending) rather than through taxation; resume supply-side policy (€50bn less in production taxes); work more; collective funded pensions.
« Remettre la France sur la bonne voie, c'est aussi rétablir les comptes. […] Nous sommes tout à fait capables de le faire aussi, en baissant la dépense plutôt qu'en augmentant les impôts. Et en travaillant plus. »
Translation by the editorsPutting France back on the right track also means restoring the public accounts. […] We are quite capable of doing that too, by cutting spending rather than raising taxes. And by working more.
Site de campagne « Avec Édouard 2027 », transcription du discours du meeting de l’Adidas Arena, 5 July 2026. Words of Édouard Philippe.« Il faudra reprendre la politique de l'offre interrompue en 2020, elle avait donné d'excellents résultats en terme d'investissements, de baisse du chômage, en terme de croissance économique. »
Translation by the editorsWe will have to resume the supply-side policy interrupted in 2020; it had produced excellent results in terms of investment, falling unemployment, in terms of economic growth.
Site de campagne « Avec Édouard 2027 », transcription du discours du meeting de l’Adidas Arena, 5 July 2026. Words of Édouard Philippe.« Rééquilibrer le financement du modèle social pour qu'il ne repose plus uniquement sur le travail et augmenter le salaire net des actifs. »
Translation by the editorsRebalance the financing of the social model so that it no longer rests solely on labour, and increase the net pay of working people.
Site de campagne « Avec Édouard 2027 », priorité « Pour une France plus prospère » (page non datée, consultée le 15 octobre 2026), 15 October 2026. Words of Édouard Philippe.Aux travailleurs, Édouard Philippe propose un « travailler plus pour gagner plus » massif et inédit. Les 35 heures uniformes pour tout le monde ont fait stagner le salaire des travailleurs.
Translation by the editorsTo workers, Édouard Philippe proposes a massive and unprecedented “work more to earn more”. The uniform 35-hour week for everyone has made workers' wages stagnate.
Site de campagne « Avec Édouard 2027 », « Trois principales annonces d'Édouard Philippe à l'Heure de vérité », 8 October 2026. Words of Édouard Philippe reported by this outlet: the text quoted is the article’s, not their exact words.
Announced effects
Effects announced by the candidate, not checked by the editors. They are not added to any amount on the site.
- Share of the consolidation effort expected from growth« Mettre en place une stratégie de sauvetage des dépenses publiques avec 50 % de l'effort sur les dépenses sociales et un quart sur l'État et les collectivités et un quart grâce à la croissance. »
Translation by the editorsImplement a rescue strategy for public spending with 50% of the effort on social spending, a quarter on the State and local authorities and a quarter through growth.
Site de campagne « Avec Édouard 2027 », priorité « Pour une France plus prospère » (page non datée, consultée le 15 octobre 2026), 15 October 2026. Words of Édouard Philippe.25 % of the effort - Tax pact: « le plus grand choc de compétitivité jamais réalisé » [“the biggest competitiveness shock ever achieved”]« Conclure un pacte fiscal inédit avec les entreprises : 50 Md€ de baisses d'impôts de production contre 50 Md€ d'aides publiques improductives en moins, le plus grand choc de compétitivité jamais réalisé. »
Translation by the editorsConclude an unprecedented tax pact with businesses: €50bn of cuts in production taxes in exchange for €50bn less in unproductive public subsidies, the biggest competitiveness shock ever achieved.
Site de campagne « Avec Édouard 2027 », priorité « Pour une France plus prospère » (page non datée, consultée le 15 octobre 2026), 15 October 2026. Words of Édouard Philippe.no amount - Gain for an employee on the SMIC if their company moves to 37 hoursUn exemple : si une entreprise décide de passer à 37 heures, pour un salarié au SMIC, cela rapportera plus de 1000 euros de plus par an.
Translation by the editorsOne example: if a company decides to move to 37 hours, for an employee on the SMIC, that will bring in more than 1,000 euros extra per year.
Site de campagne « Avec Édouard 2027 », « Trois principales annonces d'Édouard Philippe à l'Heure de vérité », 8 October 2026. Words of Édouard Philippe reported by this outlet: the text quoted is the article’s, not their exact words.1,000 € per year
Effects on households
| Model household | Current lawdisposable income | Édouard Philippeno programme released1 simulated measure |
|---|---|---|
| Single female employee on the SMIC | €20,492 | €0 |
| Single mother, one child, half-time | €21,355 | €0 |
| Couple, two children, average income | €47,724 | €0 |
| Couple of managers, one child | €92,423 | €0 |
| Single local government employee, category C | €24,859 | €0 |
| Couple, two children, one primary school teacher | €50,117 | +€5,211 |
| Single pensioner, small pension | €15,194 | €0 |
| Well-off pensioner couple | €51,418 | €0 |
Eight model households, annual disposable income, calculated with OpenFisca-France for only the measures the engine can simulate (1 measure). A zero difference means that these measures do not affect this household, not that the programme changes nothing for it. The detail, household by household, and the comparison with the other candidates.
The public accounts
How to read these amounts. These are static costs and revenues, with no feedback effect, over a full year: nothing on growth, employment or the revenue that economic activity would gain or lose. A higher net cost does not on its own make a worse policy, nor net savings a better one: each programme rests on an economic model (demand-led stimulus, lower compulsory levies, consolidation of the public accounts…) that the cost schedule does not settle. GDP itself measures a volume of activity, not well-being or the usefulness of what is produced. Economic models and feedback effects.
- New spending
- €8.3bnfrom €8.3bn to €13bn
- Revenue cuts
- €1.7bn
- New revenue
- €0bn
- Savings
- €23bnfrom €20bn to €30bn
- Revenue and savings announced by the candidate, not counted
- €50bnthe candidate’s amounts, with no measure the cost schedule can cost; never added
- Spending announced by the candidate, not counted
- €50bnthe candidate’s amounts, with no measure the cost schedule can cost; never added
- Separately: State lending (debt, not deficit)
- −€4.9bnfrom −€9.6bn to −€4.9bn
No sum published. We only add up these totals if at least 60% of the costable essential levers carry a position of the candidate whose cost is known (costed, including by extrapolation, or status quo; a position costed only in part counts for half). Here: 6.5 out of 41 (16%: 9 levers of known cost, 5 of them costed in part). Below that, a sum would compare unrelated scopes from one candidate to another. The totals remain published: each one applies only to the positions it counts.
Annual order of magnitude, in billions of euros, over a full year, compared with current policies, with no behavioural effect; each line is in euros of the year of its source (shown on its page); a recalibration on a single price and GDP framework is planned. Each total is a positive amount; line by line, “+” is revenue or a saving for the public accounts, “−” spending or lower revenue. Under each total, the sum of the lower bounds and that of the upper bounds of the lines: the ranges are added bound by bound, which gives an order of magnitude, not a confidence interval.
Line by line
- Numbers and pay of civil servantsOne retirement in three not replaced (750,000 retirements expected)* Outside the range measured by the source: linear extrapolation (measured range: -150,000 to 150,000 staff). Assumption by the editors. Partial costing. Coefficient calculated by the editors from Sénat, « L'essentiel » sur le PLF 2026, programme « Fonction publique » de la mission « Transformation et fonctions publiques » (page 2): the position is marked as an assumption by the editors. Reading: one retirement in three not replaced out of the 750,000 expected during the five-year term, i.e. around 250,000 fewer staff at the end of the term, costed at the average cost of a public employee (bottom of the range at the cost of a local authority employee); beyond 150,000 staff (domain measured by the Cour des comptes), linear extrapolation. The campaign website (priority « Pour une France plus prospère ») writes « Supprimer un tiers des fonctionnaires partant à la retraite, soit plus de 250 000 postes sur le quinquennat » [“Cut one third of civil servants retiring, i.e. more than 250,000 posts over the five-year term”]: costed at 250,000, the most cautious value (partial costing). The reorganisation of State agencies is not costed.+€11bn* (outside the range measured by the source: linear extrapolation)saving, +€7bn to +€16bn
- Teachers' pay+20% in average pay over the five-year termAssumption by the editors. Coefficient calculated by the editors from Sénat, rapport spécial PLF 2026, Enseignement scolaire: the position is marked as an assumption by the editors. In the same source, the candidate says he will fund this increase and the reduction in class sizes through the fall in the number of pupils (« près d'un million d'élèves en moins » [“almost a million fewer pupils”]), « sans dégrader les finances publiques » [“without damaging the public finances”]. This counterpart, with no amount, is not costed: the cost shown is gross.−€7.1bnnew spending, −€12bn to −€7.1bn
- New nuclear reactors8 EPRs on top of the 6 already planned, i.e. 14* Outside the range measured by the source: linear extrapolation (measured range: 0 to 6 reactors). Assumption by the editors. Coefficient calculated by the editors from EDF, communiqué du 18 décembre 2025, « EDF shares its forecasted cost estimate of the EPR2 programme for €72.8bn » (copie d'archive du 13 octobre 2026, le site renvoyant une erreur 403): the position is marked as an assumption by the editors. Central value brought down to the smallest amount: 2032 financing need acknowledged as overestimated beyond the six EPR2s of the PPE3, disbursed later than the coefficient assumes (2027 to 2038); lower bound: EDF's December 2025 estimate, 60% financed by a State loan paid out over 12 years (€0.61bn per reactor). Fourteen EPR2s, i.e. eight more than the six in the PPE3 (multi-year energy programme). Beyond the six EPR2s of the PPE3, the cost-schedule coefficient (disbursements spread from 2027 to 2038) is extrapolated linearly: it probably overestimates the 2032 financing need, since the subsequent reactors are disbursed later. State loan: weighs on the debt, shown separately from the balance.−€4.9bn* (outside the range measured by the source: linear extrapolation)additional State lending, on the debt, −€9.6bn to −€4.9bn
- Legal retirement age65, graduallyAssumption by the editors. Partial costing. Timetable given by the same source: first restore the 2023 reform (64), then reach 65 « en moins de dix ans » [“in less than ten years”], i.e. the Cour des comptes’ current-pace scenario (65 for the 1968 to 1972 generations: €4.7bn in 2035). The Court costs only the year between 64 and 65, in 2035 and not in 2032; the quarter between 63 years and 9 months (the law in 2032) and 64 is not counted. This gain and that of the contribution period (costed at 176 quarters, the costing horizon) are added together, minus the share common to both increases, removed from the smaller of the two gains (overlap declared in the cost schedule, measured from Cnav data: 8% of the gain from the age, 23% of that from the contribution period, shares that apply to two increases at the pace of one quarter per generation). Overlap with “Contribution period”: the estimated common part (€0.4bn) is withheld from “Contribution period”; this one is counted in full.+€4.7bnsaving
- Unemployment, max. benefit duration12 months maximum for under-50s, « comme l’Allemagne » [“like Germany”]* Outside the range measured by the source: linear extrapolation (measured range: 18 to 24 months). Assumption by the editors. Partial costing. Coefficient calculated by the editors from Unédic, Réforme 2023 : premiers effets de la réforme de contracyclicité: the position is marked as an assumption by the editors. Central value brought down to the smallest amount: gain acknowledged as overestimated, since 50 to 54-year-olds, whom the candidate excludes, are counted; for this parameter, the lower bound of the coefficient (€0.7bn per month) is also its central value. 12 months, read as the maximum compensation period before 55 under current law (cost-schedule parameter); below 18 months (domain measured by Unédic, 18 to 24 months), linear extrapolation. The candidate’s age threshold (50) differs from that of current law (55): 50 to 54-year-olds, counted here, would not be affected, and the gain is overestimated accordingly. Claimants after a negotiated termination (rupture conventionnelle), already compensated for at most 15 months before 55 since 1 September 2026 (law no. 2026-470 of 11 June 2026), are also counted as if they were compensated for 18 months: the gain is further overestimated on this side; Unédic only costs the amendment as a whole (€0.72bn to €0.945bn, seniors included), which does not make it possible to isolate this share, which is therefore not removed. The central coefficient (€0.7bn per month) is already the lower bound of the range: no more cautious amount is published.+€4.2bn* (outside the range measured by the source: linear extrapolation)saving, +€4.2bn to +€4.5bn
- Contribution period45 years, graduallyAssumption by the editors. Partial costing. Coefficient calculated by the editors from Service-public.fr, fiche F35063 (durée d'assurance par génération): the position is marked as an assumption by the editors. Central value brought down to the smallest amount: gain acknowledged as overestimated, since the coefficient for the extension is that of 2035 (Cour des comptes), which overstates the 2032 gain; lower bound of the coefficient: €1bn per quarter, an effect reached as early as 2030 according to the Court. 45 years, i.e. 180 quarters, reached « progressivement » [“gradually”]; the same source gives the timetable of the reform, « en moins de dix ans » [“in less than ten years”] (video of 29 September 2026). At the pace of one quarter per generation, that of the Cour des comptes, only the first four quarters (176, 1969 generation) have an effect within the costing horizon: the position is costed as the Court’s « 176 trimestres » scenario (table no. 7 and table no. 12, page 93: 1969 to 1973 generations), €5.2bn in 2035, i.e. €4bn to €5.2bn; quarters 177 to 180, reached beyond the horizon, are not costed (partial costing). This gain and that of the age of 65 are added together, minus the share common to both increases, removed from the smaller of the two gains (overlap declared in the cost schedule, measured from Cnav data). Of which €0.4bn not added, common base with “Legal retirement age”. For an increase in both age and contribution period, the Cnav (Prisme model) costs, for 2030, in current euros, the age raised by two years at 3 months per generation with the period accelerated by one quarter per generation (€17.7bn), the accelerated period alone (€4.7bn) and the age raised by three years at 4 months per generation (€18.8bn): report annexed to the amending social security financing bill for 2023, table 5, page 27. The age alone raised by two years at 3 months per generation is not costed there: in 2030, it has reached three-quarters of the increase at 4 months per generation, hence 18.8 × 3/4 = €14.1bn. Common part: 14.1 + 4.7 − 17.7 ≈ €1.1bn, i.e. 8% of the gain from age (1.1 / 14.1) and 23% of that from the period (1.1 / 4.7). Editors' calculations.+€3.6bnsaving, +€3.6bn to +€4.8bn; €0.4bn more, costed, not added
- Income tax scaleNo income tax for 3 years after a birth (middle classes), €3,000 above thatAssumption by the editors. Coefficient calculated by the editors from DGFiP, Impôt sur le revenu : répartition de l'impôt moyen par dixièmes de RFR par part, onglet a2024: the position is marked as an assumption by the editors. Benefit per household: min(tax, €3,000) during the three years following a birth. Editors' calculation: average net tax of the deciles of RFR (reference taxable income) per share (DGFiP, 2024 income), capped at €3,000, i.e. €877 per household at most, applied to 1.93 million households at most (three times the 643,905 births of 2025, Insee), assuming that these households are distributed like all households: €1.7bn a year at most. The candidate announces €3bn (campaign website): the gap comes from the distribution assumption, which only a microsimulation (OpenFisca, LexImpact) could settle; « familles qui travaillent » [“working families”] is not defined (not taken into account).−€1.7bnrevenue cut
- Adaptation to climate changeSingle climate adaptation fund of €2bn a year (Barnier fund and Fonds vert)Assumption by the editors. Candidate’s amount, taken as is. Reading adopted: the single fund of €2bn a year brings together existing appropriations; the new spending is the difference from those of the PLF 2027, in payment appropriations: Barnier fund €238.8m and Fonds vert €981.4m, i.e. 2 − 1.22 = €0.78bn a year (candidate's amount used). Other reading: in commitment authorisations (€300m and €1bn), €0.7bn.−€0.8bnnew spending
- Funded shareCollective funded pensions for all employees, €500 from the State at first jobAssumption by the editors. Partial costing. Coefficient calculated by the editors from Céreq Bref n° 487-488, « S'insérer dans un monde instable : le diplôme reste une valeur sûre » (enquête 2024 auprès de la Génération 2021): the position is marked as an assumption by the editors. Reading adopted: €500 paid once by the State to each young person at their first job, the annual flow of first jobs being taken as equal to that of first-time leavers from the education system (773,000 in 2021, Céreq), i.e. about €0.39bn a year. Not costed: the extension of collective funded pensions to all employees, with no rate or funding method (contributions diverted from the pay-as-you-go system or new savings). The payment is counted as spending; an account remaining the property of a public fund could be a financial transaction.−€0.4bnnew spending
- Right of asylumSafe countries voted yearly, end of asylum for life; suspended in Mayotte and GuyaneAssumption by the editors. Partial costing. Coefficient calculated by the editors from Sénat, commission des finances, note de présentation PLF 2026, mission « Immigration, asile et intégration »: the position is marked as an assumption by the editors. Central value brought down to the smallest amount: gain acknowledged as overestimated: shifts to ordinary emergency accommodation and State medical aid are not deducted; the central value is the lower bound of the cost per application (rule common to positions costed through the gain per asylum application). Only the suspension of the registration of applications in Mayotte and Guyane is costed: 10,490 applications in 2025 (Guyane 8,897, Mayotte 1,593, Ofpra), at the national average cost of an application, measured in mainland France (material support is lower overseas: the gain is probably overestimated). The annual list of safe countries and the end of « asile à vie » [“asylum for life”] have no costed effect. The knock-on effects on emergency accommodation and state medical aid are not counted: the gain is overestimated. Compliance with international and European law not assessed.+€0.02bnsaving, +€0.02bn to +€0.09bn
- Corporate income taxNo tax increase for businesses, « qui payent déjà trop » [“which already pay too much”]€0bnzero cost
* Outside the range measured by the source: linear extrapolation. The proposed value lies outside the range the source measured; the amount extends its coefficient in a straight line and counts in the totals. 3 extrapolated lines:
- Numbers and pay of civil servants: -250,000 staff, measured range -150,000 to 150,000 staff.
- New nuclear reactors: 14 reactors, measured range 0 to 6 reactors.
- Unemployment, max. benefit duration: 12 months, measured range 18 to 24 months.
Overlaps
Partial withdrawals. These positions partly overlap another position of the candidate: the cost schedule estimates the share of each that falls within the common base, and only this common part is withheld from the smaller of the two. The rest is counted; the line is marked partial.
- Contribution period (saving): €3.6bn counted, €0.4bn not added.
Amounts announced by the candidate
The amounts that Édouard Philippe puts forward, with the direction given to them (“+”: gain for the public accounts, “−”: cost). They are never added to the totals or to each other. The gap with our calculation is only given when both cover the same scope: not for a position that is not costed, costed in part, based on an assumption by the editors, or whose amount is the candidate’s own, taken as is; and only when the announcement falls outside the range of our calculation (otherwise: “within the range”).
- Income tax scaleCampaign website, « Trois principales annonces d'Édouard Philippe à l'Heure de vérité » (8 October 2026): « Concrètement, tous les foyers qui paient moins de 3 000 euros d’impôt sur le revenu seront exonérés d’impôt pendant trois ans, et ceux qui en paient plus bénéficieront d’une réduction d’impôt de 3 000 euros. Ce dispositif, qui coûte 3 Mds € par an […] » [“In concrete terms, all households paying less than 3,000 euros in income tax will be exempt from tax for three years, and those paying more will benefit from a tax reduction of 3,000 euros. This scheme, which costs €3bn a year […]”]Our calculation: −€1.7bn per year. No gap calculated: costing based on an assumption by the editors.−€3bncost to the public accounts
- Production taxes« 50 Md€ de baisses d'impôts de production contre 50 Md€ d'aides publiques improductives en moins » [“€50bn of cuts in production taxes in exchange for €50bn less in unproductive public subsidies”]: two equal amounts, without saying whether they apply per year or over the five-year term.Position not costed. Quoted, not counted.−€50bnrevenue cut
- Adaptation to climate change« doté de 2 milliards d'euros par an » [“endowed with 2 billion euros a year”]; « Deux milliards, c'est une somme importante. Mais rapportée aux 5 milliards d'euros que coûtent chaque année les catastrophes naturelles, c'est de l'argent bien investi » [“Two billion is a large sum. But compared with the 5 billion euros that natural disasters cost every year, it is money well invested”] (Les Ponts-de-Cé speech, 17 September 2026, reported by AFP).Our calculation: −€0.8bn per year. Candidate’s amount, taken as is.−€2bncost to the public accounts
- Public aid to businesses« 50 Md€ d'aides publiques improductives en moins » [“€50bn less in unproductive public subsidies”], in exchange for « 50 Md€ de baisses d'impôts de production » [“€50bn of cuts in production taxes”]: period (per year or over the five-year term) not specified.Position not costed. Quoted, not counted.+€50bnsaving
What these amounts cover
10 costed positions out of 41 (24%); 9 essential levers costed out of 41
- Costed positions
- 10 out of 4124% of the positions recorded
- Status quo, zero cost
- 1current law maintained or zero amount, counted separately
- Extrapolated, not added
- 3, 0extrapolated: counted and marked *; not added: entirely covered by another position; plus 1 partial withdrawal (common base)
- On costable levers
- 10 out of 2934%; the other levers are compared without being costed
- Essential levers costed
- 9 out of 41costable ★ levers of the grid with a known cost: costed (including in part, by extrapolation or not added) or status quo; 29 ★ addressed out of 57
- Assumptions, partial costings
- 10 assumptions, 6 partial costingsflagged line by line
- Still not costed: 6 positions on revenue levers (taxes, levies) and 12 positions on spending levers, for lack of a sourced coefficient that applies to them without interpretation.
- 12 positions concern levers with no direct budgetary cost (institutions, rules, objectives).
Positions not costed
30 positions, each with its reason
30 positions. For each, the reason: lever with no coefficient in the cost schedule, or position that matches no measure costed without interpretation.
- Statutory working timeLever that cannot be costed2 more hours a week, by company agreement (€1,000 a year at the SMIC)Lever with no coefficient in the cost schedule: the position is compared, not costed.
- Inheritance and gift taxNot costedAgainst more inheritance tax; gift ceilings raised for 3 yearsGift ceilings raised « très sensiblement » [“very significantly”] during the first three years of the five-year term, with no amount: nothing to cost. The cost schedule costs the allowance in the direct line, common to inheritances and gifts, not a temporary increase specific to gifts. In the same source, the candidate defends keeping the pacte Dutreil, with no costable change.
- Pupils per class, primaryNot costedReduce class sizes where necessary, with no numerical targetReduction « là où c'est nécessaire » [“where necessary”], with no target or scope: nothing to cost.
- Access to higher educationLever that cannot be costedParcoursup « ne marche pas comme ça devrait » [“doesn’t work as it should”], no specific reformLever with no coefficient in the cost schedule: the position is compared, not costed.
- Rent controlsLever that cannot be costedOpposed to rent controlsLever with no coefficient in the cost schedule: the position is compared, not costed.
- Emissions cut by 2030, compared with 1990Lever that cannot be costed« Décarboner au maximum » [“Decarbonise as much as possible”], no numerical target for 2030Lever with no coefficient in the cost schedule: the position is compared, not costed.
- Carbon priceNot costedCarbon price at the borders of the European UnionEuropean measure (the Union’s carbon border adjustment mechanism has applied since 2026): no identified national revenue to cost.
- Energy renovations per yearNot costedClimate action focused on freight, renovation and industryStated priority with no number or amount: nothing to cost.
- Wind and solarNot costedDevelop renewables, with no numerical targetDevelopment with no numerical target: nothing to cost.
- Production taxesNot costed€50bn less in production taxes in exchange for €50bn less in subsidiesPure amount with no named instrument, not costed (decision of 18 October 2026, the same as for Marine Le Pen's €20bn cut in production taxes and David Lisnard's €40bn, beyond the taxes they name): « 50 Md€ de baisses d'impôts de production » [“€50bn of production tax cuts”], without saying which (CVAE, C3S, CFE, property taxes…) or whether the amount is per year or over the five-year term; it is cited next to the total, without being counted. Former costing: €50bn a year taken at the candidate's amount. Its counterpart, €50bn less in « improductives » [“unproductive”] subsidies, is treated in the same way under the “Public aid to businesses” lever.
- High cost of living overseasNot costedIn La Réunion, replace the octroi de mer with another tax instrumentReplacement of the octroi de mer in La Réunion by an undefined instrument: nothing to cost.
- Public deficit targeted for 2032Lever that cannot be costedGolden rule on deficits by referendum, deficit at 2% of GDP in 2032Lever with no coefficient in the cost schedule: the position is compared, not costed.
- End of lifeLever that cannot be costedJan. 2025, before the law: reluctant to write assisted dying into lawLever with no coefficient in the cost schedule: the position is compared, not costed.
- Announced savingsNot costedHalf of the savings effort on social spendingDistribution of the effort with no total amount of savings: nothing to cost. Savings measure with no lever of its own in the grid, announced with no amount: « 3 jours de carence pour tout le monde, dans le privé comme le public » [“3 waiting days for everyone, in the private sector as in the public sector”] (campaign website, priority « Pour une France plus prospère », consulted on 14 October 2026), after « renforcer les journées de carence d'ordre public » [“strengthen public-policy waiting days”] (LCP, 27 August 2026).
- Family allowancesNot costedSingle allowance of €350 a month from the first child, taperingSingle family allowance « à hauteur de 350 € » [“amounting to €350”] from the first child, « dégressive avec le revenu » [“tapering with income”], by merging schemes the candidate does not name: neither the frequency (« par mois » [“per month”] comes from the press), nor the beneficiary (each child or each family), nor the form of the tapering are given, and the cost depends above all on the latter. Editors' benchmarks, not counted: without tapering, €350 per month per family with at least one minor child (7.88 million, Insee) would cost €33.1bn gross, €19.2bn net of family allowances (€13.9bn in 2025); per minor child (13.87 million), €58.3bn and €44.3bn.
- Long careersNot costedOne French person in 3 will be able to retire at 60 to 64 (long careers, arduous work)Age thresholds and conditions not specified: nothing to cost. The « 65 ans » option adopted for the legal retirement age already assumes the long-career thresholds raised by one year.
- Tax and social security expendituresNot costedAbolish tax expenditures before any tax increase, with no listAbolition of tax expenditures with no list or amount: nothing to cost.
- Level of public spendingLever that cannot be costedRestore the public accounts by cutting spending rather than raising taxesDirection with no target level: the level of spending is compared with the sum of the costed measures.
- Public aid to businessesNot costed€50bn less in « improductives » [“unproductive”] subsidies, in exchange for €50bn in taxesPure amount with no named measure, not costed (decision of 18 October 2026, common rule): « 50 Md€ d'aides publiques improductives en moins » [“€50bn less in unproductive public aid”], without saying which (budgetary spending, €30bn; tax expenditures, €40bn; reductions in contributions, €80bn, according to the minister's breakdown cited by the Senate) or whether the amount is per year or over the five-year term; it is cited next to the total, without being counted. Former costing: €50bn of savings a year taken at the candidate's amount. Treated like the €50bn cut in production taxes that it funds (“Production taxes” lever), also not costed.
- Place in the European UnionNot costedDeepen Europe towards « souveraineté européenne intégrale » [“full European sovereignty”]Institutional orientation (deepening, European sovereignty), with no budgetary measure: nothing to cost.
- Free trade agreements (Mercosur)Lever that cannot be costedProtect the European market against China (quotas, technology transfers)Lever with no coefficient in the cost schedule: the position is compared, not costed.
- Labour immigration and residence permitsLever that cannot be costedImmigration halved, quotas, family reunification suspendedLever with no coefficient in the cost schedule: the position is compared, not costed.
- Prisons and sentencesNot costedMinimum sentences for the most serious offencesMinimum sentences with no number of prison places: an indirect cost (additional prisoners) that no source read estimates.
- Defence budgetNot costedLPM « de la massification » [“of massification”]; 250,000 reservists, 50,000 volunteers a yearNew military programming act with no level of effort as a % of GDP or amount; reservists and military service volunteers with no announced cost: nothing to cost.
- Article 49.3 and revision of the ConstitutionLever that cannot be costedAgainst extending the Article 11 referendum; revise via Article 89Lever with no coefficient in the cost schedule: the position is compared, not costed.
- RailNot costedLaunch « un grand plan fret-ferroviaire » [“a major rail freight plan”], with no amountRail freight plan with no amount or content (investment in the network, operating subsidies): nothing to cost.
- Fiscal rulesLever that cannot be costedGolden rule on deficit control in the Constitution, by referendumLever with no coefficient in the cost schedule: the position is compared, not costed.
- OvertimeNot costedHours beyond 35 h, by agreement, free of tax and contributionsHours beyond 35 hours are currently exempt from income tax up to €7,500 a year and give entitlement to a reduction in employee social contributions; the measure exempts them entirely, and from all employer contributions beyond 37 hours, in companies that sign an agreement. The cost schedule only costs the abolition of the exemptions in force, not their extension, whose cost depends on the number of agreements and hours.
- CSG (general social contribution) on pensionersNot costedPensioners will have to « contribuer davantage » [“contribute more”], without saying howIncreased contribution by pensioners to the financing of the social system, with no instrument (CSG rate, 10% allowance, pension indexation) or amount: nothing to cost. The campaign website moreover promises to save pensions « sans hausse des cotisations ni baisse générale des pensions » [“without raising contributions or a general cut in pensions”].
- Birthright citizenship and nationalityLever that cannot be costedSuspend birthright citizenship (droit du sol) in MayotteLever with no coefficient in the cost schedule: the position is compared, not costed.
What this costing does not measure
- Growth and employmentThe effect of the measures on activity and employment, and the revenue gained or lost as a result; it depends on the economic model used: models and feedback effects.
- Education, health, researchLong-term effects on human capital, productivity and innovation.
- InequalityThe distribution of gains and losses across the whole population, beyond the eight model households.
- Public servicesWhat new spending or savings change in the quality of the services provided and in access to them.
- Environment and climateEffects on emissions, natural resources and adaptation to climate change.
- Sovereignty and external dependenceEffects on the country’s dependence on other countries: energy, industry, defence, supplies.
- Interest rates on the debtThe effect of a programme on the terms on which the State borrows, which also depend on the make-up of the holders of its debt.
The rules and the full cost schedule, with its sources: the method.